Updated
G6Flatbed and step deck boards
Free flatbed load board options, and step deck searches
Looking for a free flatbed load board? A few boards state flatbed support and a free option on their own pages, listed first below with sources and dates. Then: the trailer filters that cover open deck freight, what to read on every post, and why a step deck search runs twice.
By ConvoyFox dispatch desk
FAQ / 5 questions
Questions carriers ask
Answer first, in a few sentences. No fine print hiding underneath.
Are free load boards for flatbeds any good?
They can be, if their freight runs in your lanes. A free tier may limit features, and a broker-run board shows only one broker's open deck loads. Try a free option that states flatbed support, track what you actually book from it for a few weeks, then decide whether a paid plan adds enough.
Why do step deck loads appear as flatbed posts?
Because many shippers post open deck freight by the most common trailer name, and some do not know which trailer their load needs. Tall freight posted as flatbed may only fit on a step deck. Read the height on every open deck post, or call to get it.
Should a flatbed post always include tarp pay?
Not always, but when a load needs tarps it is fair to ask for tarp pay, because tarping takes time and wears gear. If the post says tarp required and nothing about pay, ask on the call. Get any tarp pay written on the rate confirmation before you sign it.
What does specialized mean on a load board?
It usually covers open deck trailers beyond a standard flatbed, such as step decks, double drops or removable goosenecks. Boards use the label differently, so check how each one defines it. If you run a step deck, include specialized in your search and read every post for height.
Do I need separate boards for flatbed and step deck?
No. Most boards that carry open deck freight cover both, and you choose the trailer in each saved search. Keep one saved search per trailer, because the deciding numbers differ: width and tarps for the flatbed, load height for the step deck.
Next stop / You approve every load
We read the dimensions. You check the deck.